Price a job from plans one trade at a time: take off the quantities, confirm each line against its sheet, add the scope the takeoff leaves out, then apply a dated material price, your own labor rates, and overhead and margin.

An automatic takeoff returns the counted and measured lines for a trade; what it leaves out, the waste, the supplier quotes and the labor are still the estimator's work, and they differ from trade to trade.

Written to plan 2027 work. It describes what is true today and what to check during 2027, and it makes no forecasts. Portravo facts and prices are as of November 13, 2026. This guide will be revised when those facts are re-checked.

Portravo publishes this guide. Where it describes Portravo, it uses what the product pages state.

The same five steps for every trade

  1. 01Take off the trade: counts, lengths, areas and volumes, each tied to the sheet it came from.
  2. 02Confirm or edit each line against its sheet. In Portravo nothing is priced until you do, and lines left pending are skipped and counted. See the confirm gate.
  3. 03Add what the takeoff does not cover for that trade, from the lists below, as your own lines, allowances or exclusions.
  4. 04Price materials from a dated basis, and get supplier quotes for the large lines and for anything the takeoff lists but does not price.
  5. 05Apply your own labor rates by role, then overhead and margin, and export.

The trade sections below repeat what Portravo's trade takeoff pages say each takeoff returns and leaves out. Portravo publishes no accuracy figure for these trades, so every line comes to you to review.

On the upload page, each trade shows whether it runs Automatic today or is Done by our team by hand.

Electrical: what comes back and what you still do

Portravo reads the electrical sheets in your plan set, matches each symbol to the legend, and counts it sheet by sheet. Every counted symbol is marked on the drawing so you can check it.

What the takeoff returns

  • Receptacleseach

    Duplex, GFCI, special-purpose (range, dryer), ceiling, double duplex, floor boxes

  • Switches and controlseach

    Single-pole, three-way, four-way, dimmers, wireless switches, occupancy sensors

  • Lights and fanseach

    Recessed, ceiling, wall, pendant, strip and exterior lights, chandeliers, ceiling fans, exhaust fans

  • Life safety and low voltageeach

    Smoke, CO and combination detectors, exit and emergency lights, data, TV and phone outlets, doorbells

  • Serviceeach

    Panels and junction boxes

What you still check

  • Open each line and look at the marks on the drawing. Where two readings disagreed, the line is on the Check these list with both numbers.
  • Read the assumptions on each priced line. When the plans do not state a rating, like 15A or tamper-resistant, the line says the price assumes it.
  • Check the sheets the run read only for reference, and anything on the list as not found.

What you add or price yourself

  • It does not measure wire or conduit runs. It counts devices and fixtures. A priced device carries its box, plate and a wire allowance per device.
  • The panel, circuits and service are not priced unless a line lists them. Grounding and bonding are not taken off.
  • Some counted items have no safe price match, like the ceiling fans, smoke detectors and special-purpose outlets in the sample. They stay unpriced until you price them.

The electrical takeoff page: what it reads off the drawings

Framing: what comes back and what you still do

Portravo reads the framing plans in your set and the sheets around them. It turns the printed callouts and the drawn members into framing lines, each tied to the sheet it came from.

What the takeoff returns

  • Stud walls and plateslinear feet

    Wall runs with stud size and spacing from the callouts and wall notes

  • Floor joists and rimeach and linear feet

    Joists per zone from the printed spacing and the zone width, rim from the floor edge

  • Beams, girders and headerslinear feet

    LVL, PSL and built-up members, with the size and series printed on the plans

  • Posts and columnseach

    Posts from the callouts and the drawn post symbols

  • Roof framingeach

    Rafters and trusses from the spacing and the drawn layout, gable ends included

  • Sheathingsquare feet

    Subfloor, wall and roof sheathing from floor areas, wall heights, openings and roof slope

What you still check

  • Check the joist and stud counts against the spacing printed on the plans.
  • Confirm wall heights and stud lengths. When the plans state them once for a whole floor, the line says where the number came from.
  • Look at the Check these list for members the readings did not agree on.

What you add or price yourself

  • Framing hardware is not taken off yet: connectors, anchors, nails and bracing.
  • Interior stairs, rails and attic access are not taken off. Neither are exterior wood steps and landings.
  • Engineered lumber (I-joists, LVL, PSL, rim board) and trusses are on the takeoff but not priced. You price them from your supplier.

The framing takeoff page: what it reads off the drawings

HVAC: what comes back and what you still do

Portravo reads the mechanical sheets in your plan set, plus the floor plans and schedules that show where the baths, laundry and kitchen are. It counts the HVAC items it finds, sheet by sheet.

What the takeoff returns

  • Equipmenteach

    Furnaces, air handlers, condensers, heat pumps, thermostats, wood stoves and fireplaces

  • Registers and grilleseach

    Supply registers and return grilles, split by the CFM printed on the plans

  • Ventilationeach

    Bath and kitchen exhaust fans, range hoods, dryer vents, and one wall or roof cap per termination

What you still check

  • Check each register and grille count against the sheet it cites.
  • Check the exhaust caps. They are worked out from the rooms on the floor plans and checked against the exhaust labels on the elevations.
  • Add the furnace, air handler or condenser from your supplier's quote.

What you add or price yourself

  • Ductwork is not taken off. Duct runs are read only to place the registers and equipment.
  • Equipment is listed but not priced. The right unit depends on the load and your supplier.
  • Flues, chimneys and hearths are not included with stoves and fireplaces.

The HVAC takeoff page: what it reads off the drawings

Plumbing: what comes back and what you still do

Portravo reads the plumbing sheets and risers in your plan set, and the floor plans and fixture schedules beside them. Fixture counts are read two ways and compared before they reach you.

What the takeoff returns

  • Fixtureseach

    Toilets, lavatories, kitchen sinks, tubs, showers, laundry sinks, washer boxes, hose bibbs, floor drains

  • Appliance hookupseach

    Water heater, dishwasher, ice maker box, sump pump

  • Watereach and linear feet

    Service entry, meter, treatment equipment, and water pipe by printed size

  • Drain, waste and venteach and linear feet

    Cleanouts, roof vents, and DWV pipe by printed size

  • Fuel gaseach and linear feet

    Gas meter, appliance connections, shutoff valves, and gas pipe by printed size

What you still check

  • Where the floor plan and the riser disagree on a fixture count, the floor plan count is used and the riser count is shown for you to decide.
  • Check that pipe lengths per size add up to the total printed on the riser.
  • Look at any pipe size label the line marks as unclear.

What you add or price yourself

  • Pipe is not measured off a diagram drawn not to scale. Without printed lengths or a scaled plan, that pipe is listed as not found for you to fill in.
  • No waste allowance is added to pipe. The length is the printed length.
  • Lines with no safe price match stay unpriced until you price them.

The plumbing takeoff page: what it reads off the drawings

Landscape and irrigation: what comes back and what you still do

Portravo reads the planting and irrigation sheets in your set. It takes the quantities from the printed schedules and checks them against the tags, symbols and linework on the plans.

What the takeoff returns

  • Plantingeach

    Trees (with one staking kit per tree), shrubs, massed shrubs, grasses and ground covers

  • Areassquare feet

    Sod, seed and surfacing like decomposed granite or gravel

  • Mulch and topsoilcubic yards

    From the printed areas and depths. Mulch comes as a low to high range

  • Existing treeseach

    Trees to remove and trees to protect

  • Irrigationeach

    Heads, rotors, sprays and bubblers, valves, controller, backflow, sensors, meter, and one valve box per valve

  • Irrigation pipelinear feet

    Pipe, dripline and sleeves, plus a fittings allowance carried on the pipe

  • Edginglinear feet

    From the schedule, or measured from the plan when only the line style is given

What you still check

  • Check where a schedule quantity and the plan tags or symbols disagree. Those lines are flagged.
  • Confirm the stated defaults: one staking kit per tree, one valve box per valve, the fittings allowance, and the waste on sod, pipe and edging.
  • Pick a mulch quantity inside the range given.

What you add or price yourself

  • Control wire, drip fittings, air relief and flush valves and thrust blocks are not drawn as quantities. They ride the fittings allowance or you price them on site.
  • Fine grading and soil amendment are not taken off.
  • Tree removal and protection are counted but not priced. Plants a store does not carry are priced from a regional estimate and marked Estimate.

The landscape and irrigation takeoff page: what it reads off the drawings

Trades without a trade page

Painting, Concrete, Roofing and Drywall can be picked on the upload page, which shows whether each is Automatic or Done by our team today. A takeoff done by our team is priced by hand, usually within 1 business day, or refunded in full. For concrete, the concrete takeoff guide works through cubic yards from plan dimensions.

Pricing the confirmed lines

From quantity to price

  • Material: each priced material line shows its source, location and as-of date. That is a local Home Depot price where one is available, or the Portravo benchmark as a fallback, labeled indexed when a regional adjustment was applied. Get supplier quotes for the large lines.
  • Unpriced lines: anything with no safe price match stays unpriced until you price it. From the trade sections above, HVAC equipment, engineered lumber and trusses, and tree removal and protection are examples.
  • Labor: hours times your rate card. Where a role has no rate of your own, a metro rate from BLS wage data is used and labeled. Enter your 2027 rates before the first bid of the year.
  • Overhead and margin: set them on the estimate. The markup and margin calculator shows how the two differ.
  • Output: Excel for you, with the full bill of materials and its source and date columns, and a clean PDF for the customer.

What a takeoff costs

Prices as of November 13, 2026. One takeoff is one trade on one project: $75 pay as you go. The whole job, every trade on one project, is $149. Two or more single trades on the upload page never cost more than the whole job: when they would, the order becomes the whole job. Monthly plans start at $199 for 5 takeoffs. See pricing.

Your first takeoff has a 14-day money-back guarantee. The terms say what it covers.

Questions

Which trades does Portravo take off automatically?
The upload page shows it trade by trade, as of today: Automatic or Done by our team. Trade takeoff pages exist for electrical, framing, HVAC, plumbing and landscape and irrigation.
Does the takeoff price HVAC equipment?
No. Furnaces, air handlers, condensers and similar equipment are listed when the plans show them but are not priced. Carry your supplier's quote as its own line.
Does an electrical takeoff include wire and conduit?
No. It counts devices and fixtures. A priced device carries its box, plate and a wire allowance per device; wire and conduit runs are not measured.
Should I order a whole job or single trades?
If you are pricing every trade, the whole job is $149; one trade is $75. On the upload page, two or more single trades never cost more than the whole job.

What would change this advice

  • A trade takeoff starts reading or pricing something it leaves out today, such as ductwork, wire runs or framing hardware. The trade sections here come from the same data as the trade pages, so they change with them.
  • A new trade page, or a trade moving between Automatic and Done by our team.
  • Portravo changes its prices. The figures here are read from the same settings checkout uses.
  • You find something here that is wrong or out of date. Write to hello@portravo.com and we will check it, then correct and re-date the guide.