Portravo Live is in beta. Join the interest list.
Live turns a site visit into a quote you review, a proposal your customer can accept from a link, and a job plan for the crew. It is open to a small group of contractors while we focus on plan takeoffs. Tell us how you would use it and we will reach out when there is room.
- Built for jobs with no plan set: service calls, upgrades, remodel walkthroughs.
- Runs in a phone browser. Mentra Live glasses are optional.
One site visit, five steps to a job plan
Nothing prices itself, and nothing goes to the customer until you send it.
- 01Capture
Visit
Photos from the phone or Mentra Live glasses. Notes by hold-to-talk dictation, or typed when it is loud.
Consent confirmed before the first capture.
- 02AI on every photo
Read
Each photo is read as it lands: what it is, nameplate fields, the scope it implies, concerns, questions for the customer.
Measurements only with a reference in frame.
- 03Lines, review, price
Quote
Captures become takeoff lines that cite their evidence. You review every line, then price it with your rate card.
No catalog fit? An allowance you set on site.
- 04Send, accept
Proposal
Scope, inclusions, exclusions, assumptions and payment terms drafted for you to edit and send.
Customer accepts with a typed name or declines.
- 05Crew, materials, days
Plan
Phases in build order, tasks with role and hours, and a materials pull list by category.
Printable for the crew.
Open to a few, on purpose
Small group, added by hand
We open Live to a few contractors at a time so we can watch every visit and fix what breaks.
Plan takeoffs come first
Our time goes into making plan takeoffs right. Live opens wider once takeoffs are where we want them.
Proposal links keep working
Any proposal link a contractor already sent from Live still opens for their customer, as before.
Free to join the list
No card and no commitment. Joining only tells us you want in.
Live visit
Ramos garage, EV + panel
Sample site visit · electrical
- Customer told this visit is recorded09:02
- Nameplate09:04 · glasses
Square D QO 100A main panel · 120/240V
makeSquare Damps100volts120/240serialunreadableNo open spaces for a 2-pole breaker
- Note09:06 · dictated
“Wants a 50amp charger on the garage wall, left of the side door. Car shows up next month.”
- Area09:09 · phone
Garage, east wall
Finished drywall. Clear run along the ceiling line to the charger spot.
scopeEV circuit 50Ascopesurface EMT - Measurement09:11 · glasses
Panel to charger spot 38 ft
basis: tape measure in frame
Reading photo
09:12 · glasses
Running scope
3 lines · 4 captures
- 200A panel set + terminate1 ea86%
- EV charger circuit, 50A, surface EMT38 lf74%
- Patch and texture at the old panel1 ea52%
Uses 1 estimate · reruns on this visit free
A recreation of a Live visit on a phone, not a screenshot.
Straight answers
Ready now
Have a plan set? Get the takeoff today.
Upload the plans and get quantities with per-page counts, the evidence highlighted on the drawings, and local material prices with the store and date.